Looks like, It is going to rain here today...
0
1
0
test test test
0
0
0
The first image is up on the wall!!!
0
0
0
master node installation complete.
0
0
0
All PCs connected to TVs. PC screens showing on TVs. TV back panels installed. One spare TV panel created, put back in box.
0
0
0
Mike has put powerplugs. Getting quote for surge protectors. All TVs set to correct input.
0
0
0
Luc, Lance, Byungil are here. Setting up PCs.
0
0
0
All 5 columns are up.
0
0
0
Windows PC connected to TVs. Remote used to set mode, input. TV shows PC screens.
0
0
0
Four columns up. One TV is broken. Spare will replace it.
0
0
0
Three columns are up
0
0
0
Greg is in. Second column close to completion.
0
0
0
Greg is preparing (cutting, assembpling) other columns for installation of TVs for tomorrow.
0
0
0
First column with 4 TVs is up. 17 PCs waiting outside the room.
0
0
0
Mike brought the saw. Greg has moved all the TVs inside the room. Lunch planned for 12 noon.
0
0
0
The columns are too long. I asked Mike to get a saw to Greg. Greg will cut the columns. Waiting for Mike.
0
0
0